Case Study

TME-1527 Stacker

Project Scope

The customer needed to quickly launch a temporary production line to accelerate time-to-market for a new product. As part of the process, a dryer unit had to be lifted, repositioned approximately five feet, and accurately stacked on top of a washer unit. The solution required a safe, efficient, and repeatable method for handling the equipment while supporting the production line’s accelerated implementation schedule.

Solution

The team designed a comprehensive material-handling solution that incorporated a Unified Industries four-post workstation, an electric hoist, and an electric tractor to safely and efficiently move the dryer unit. To securely handle the product during the lifting and stacking process, the team also engineered a custom end effector that combined both clamping and vacuum technology, ensuring precise positioning, product stability, and safe operation throughout the transfer.

Project Details

Client Industry

Consumer Products

Project Date

2025

Project Location

Delaware, OH

Project Manager

SHAWN
Shawn Greguric

sgreguric@toolmatics.com

Video

Interested in working with TooMatics?